Alternatively you can use the dropdown menu to find the junction detail you need depending on the type of construction envisaged for your project.
Floor build up detail. 215mm aircrete solid wall λ 0 15 w mk render insulation λ 0 022 w mk pitched roof gable. On this note you may be. This article teaches you how to build a floor for a house on a concrete foundation. Build up process another factor to be considered when constructing a wet room is the floor build up.
Draw up a basic floor framing plan. Some newer homes have manufactured i beam shaped joists. There are three general types of ground floor construction. Typing e1 e5 etc will take you to the corresponding junction details.
50mm insulation 0 022w mk beneath rafters. Framing a floor using i joists. Nb it is important to be aware that an initial search for a detail for example e5 will bring up multiple details. This framing system can also be used for framing storage shed floors this floor framing system is typical over basements and crawl spaces.
It s essential that the void under the floor which should be at least 150mm deep is vented via airbricks in the lower walls to protect the building from any build up of noxious gases such as radon or methane. Floor joists are typically 2 by 8s 2 by 10s or 2 by 12s. A floor s framework is made up mostly of wooden joists that run parallel to one another at regular intervals. Solid external masonry wall.
Wet rooms can be constructed on both timber and solid floors but the method of installing the wet floor and the elements used to create the gradients falls on each substrate will vary. Extremely long spans staircases or interior walls typically require additional support which can complicate your framing. Before you begin cutting or measuring grab a pencil and paper and sketch an outline of your floor. To ensure a level finish to the floor a layer of screed is added over the top of the concrete which consists of sand and cement.
The floor surface is then stabilised by grouting with a weak sand cement mix brushed into the joints. 150mm insulation 0 044w mk between rafters. Stairs to keep things clear stairs feature an arrow to show which way s up. A typical way of constructing a solid floor would be to provide a base of hardcore with sand blinding with a layer of concrete over that.